Jan 9th: Aside from the Nave most of the building has been painted and a number of light fixtures installed. The tile is down in the bathrooms and most of the fixtures have been installed.


Jan 9th: Aside from the Nave most of the building has been painted and a number of light fixtures installed. The tile is down in the bathrooms and most of the fixtures have been installed.

